Carlson Software - Surface Mining

Carlson Surface Mining For complex surface mining design and techniques with precise scheduling and timing The Carlson Surface Mining module enables users to find the most efficient mine design by testing layouts in plan, section and 3D view. Use Carlson to: Integrate geologic and surface mod


software for mining truck shovel calculation

» lima peru mining truck » software for mining truck shovel calculation » jaw crusher /mining equipment/gold/mining » china metallurgy mining, coal mining and ... Learn More. Electric Rope Shovel Simulator | VISTA Training Inc.


A stochastic simulation framework for truck and shovel ...

A stochastic simulation framework for truck and shovel selection and sizing in open pit mines by S.R. Dindarloo*, M. Osanloo†, and S. Frimpong* Geometry (equipment width, weight, turning radius, swing angle, etc.) is controlled mostly Synopsis by mine design and layout, as well as the Material handling in open pit mining accounts for about 50% of production operational constraints.


Shovel-Truck Systems: Modelling, Analysis and Calculations ...

Shovel-Truck Systems: Modelling, Analysis and Calculations - CRC Press Book This book provides a comprehensive analysis of the exploitation process of shovel-truck systems using modelling, analysis and calculations following specific procedures:- analyzing the reliability and accessibility of shovels- discussing the functioning of a truck ...


Loading calculation Theoretical Production Loaded Truck Capacity Truck Loading Time m3 Tonnes per Hour Bank Density ... Big Shovel Big Truck About iSolutions iSolutions is an innovative asset management and maintenance software and services provider. We specialise in life cycle costing and maintenance contract management.


Models for Mining Equipment Selection - mssanz.org.au

construction equipment selection and shovel-truck equipment selection for surface mines. Although a ... constraints of the mining operations to a level that is acceptable and used by mining engineers. ... further calculations are performed. This highlights an important area of research for equipment


Applications of Queuing Theory for Open-Pit Truck/Shovel ...

Applications of Queuing Theory for Open-Pit Truck/Shovel Haulage Systems Meredith Augusta May Abstract Surface mining is the most common mining method worldwide, and open pit mining accounts for more than 60% of all surface output. Haulage costs account for as much as 60% of the total


(PDF) Optimization of shovel-truck system for surface mining

Optimization of shovel-truck system for surface mining ... An example of queuing calculations, from shovel S22 to ... plan by simultaneously assigning shovels to mining faces and allocating trucks ...


Mining Equipment Costs - costs.infomine.com

Mining Equipment Fleet - 10,000 tonne per day (ore + waste) open pit mine. The following listings of equipment capital and operating costs are taken directly from the current Mining Cost Service Manual and Mine and Mill Equipment Cost Estimator's Guide.In addition to the items listed here, these manuals contain entries for 74 additional excavators, 50 additional haulers, 16 dozers, 6 graders ...


maggregate mining trucks shovels - you4basel.ch

(PDF) Optimization of shovel-truck system for surface mining. PDF In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and. Mining Trucks Haul Trucks . ® Mining Dump Trucks are engineered for ...


Undercarriage management for Mining Shovels - TrackTreads ...

A software system that caters for all OEM's along with all models of mining shovels. This can be of great value when you are operating mixed fleets, but want to manage all undercarriage in a single system. A complete inspection tool kit equipped for measuring all components on the mining shovels.


Performance Measurement of Mining Equipments by Utilizing …

In this study, OEE of shovels and trucks have been considered since they are the main equipments for the most of the Open Pit Mines. OEE calculation for Shovel Shovels are used in open pit mining as primary loading equipment. Their performance and production controls the total output of operation.


Transport & digging capacity calculation - SlideShare

Sep 16, 2013· Transport & digging capacity calculation 1. ... Typical cycle time calculation for 85t truck No. Description Value 1. maneuvering for position at shovel (in minute) 1 2. loading time (in minute) 3 3. accelerating the loaded truck (in minute) 1 4. haulage to dumping point 1067m away (in minute) 2.5 5. decelerate and positioning for dump (in ...


Giant shovels in open pit copper mine in Uath. - YouTube

Feb 03, 2013· Giant shovels in open pit copper mine in Utah. The dump trucks fully loaded can weigh over 1 million Pounds. The visitor center will be close until 2014 at least due to the ground shifting so I ...


Mining Methods and Equipment - School of Mechanical ...

The majority of open pit mines in Australia currently operate using discontinuous shovel/truck systems. These systems are favoured as they enable; (i) mining capacity to be progressively scaled up over the life of a mine; (ii) the use of narrow benches that defer the high costs of stripping, and (iii) flexibility to rapidly adapt mine plans in the face of uncertainties caused by changing ...


OPTIMIZATION OF LOAD HAUL DUMP MINING SYSTEM BY …

related, stemming from a common problem-truck and shovel location. To make a truck and shovel fleet more optimum on the basis of productivity improvements and associated cost reduction, it was essential to calculate the best match factor and truck-shovel assignment (or fleet size) for the system. However,


Thedetermination ofhaulage-truck requirements …

Thedetermination ofhaulage-truck requirements foranopen-pitoperation byR.H.A.PLAISTOWE*,B.Se.Hons.(Min.Eng.)Nottingham (Graduate Member) and ... tons per truck shiftandton-kilometres per truck shift, orfrom calculations ofcycletimes that require abasic mining simulation. ... truck or shovel serviced. An average value was de-


Increase Shovel Productivity by 2.7 ... - mining.

Rio Tinto Coal Australia (RTCA) wanted to increase machine productivity on a P&H 4100 electric shovel considered to be under performing. The goal was a productivity increase of at least 7%, or more than 2 million extra tonnes of material per year, to match equivalent machines within RTCA and hit material movement targets for the mine.


Evaluation of Hydraulic Excavator and Rope Shovel Major ...

expenditures related to possession of mining shovels (spare parts, fuels, lubricants, electricity, consumables) were also taken into consideration to calculate and compare life cycle costs of machines. The results obtained from the investigation show that use of hydraulic


Haul Road Design & Maintenance: Improving Tire & Mining ...

Haul Road Design & Maintenance: Improving Tire & Mining Truck Life. Every surface mine has them. They're the lifeline of the production system, just as important as trucks and shovels, and they can be a mining operation's greatest asset or its greatest liability.


Whitepaper TruckShovel Calculator - Strategenics

Whitepaper . TruckShovel Calculator . Optimization of Trucking Levels for Truck Shovel Fleets. ... This sort of graph is probably familiar to most people in charge of mining operations, but it ... In a mine with multiple truck shovel strips operating, some shovels may have a higher priority


100030 Case Study Improving Shovel Productivity Through ...

Case Study Improving Shovel Productivity through Improved Floor Control Jacobs Ranch Mine, USA ... The software records information for each truck loaded during the shift, including: payload, dig time, swing ... 100030_Case Study_Improving Shovel Productivity Through Improved Floor Control_Jacobs Ranch Mine__English.doc


shovel truck systems modelling analysis and calculations

shovel truck systems modelling analysis and calculations Download Book Shovel Truck Systems Modelling Analysis And Calculations in PDF format. You can Read Online Shovel Truck Systems Modelling Analysis And Calculations here in PDF, EPUB, Mobi or Docx formats. ... The book will be of interest to all mining engineers and civil engineers involved ...


TruckShovel Calculator | Strategenics

TruckShovel Calculator Tool used in the field of mining and quarry excavation work. The TruckShovel Calculator is a powerful and simple to use tool for hand held devices which can be used in the field. ... Truck Shovel Calculator accounts for the number of trucks at each excavator, informing you of the optimum number of trucks and reducing hang ...


Haul Road Design and Management

In both surface and underground mining, poorly designed and maintained haul roads can ... – Use by larger equipment than primary users (shovels, draglines, etc) – Allow room for vehicles to pass on single lane roads ... – Match bucket and truck size to minimize …


3. CALCULATION OF MACHINE RATES - fao.org

One important case is the calculation of the machine rate for a truck. When a log truck is waiting to be loaded, is being loaded, and is being unloaded, its fuel consumption, tire wear, and other running costs are not being incurred. Or, if these costs are incurred, they are at a much reduced rate.


Equipment Selection for Surface Mining: A Review

Key words: Equipment Selection, Surface Mining, Shovel-Truck Productivity, Mining Method Selection, Multi-Commodity Network Flow Introduction The general Equipment Selection Problem (ESP) is to choose a collection of compatible, but not necessarily homogeneous, items of equipment to perform a speci ed task. In many applications,


Improvements in truck requirement estimations using ...

Scheduler software. Many mining companies have adopted Deswik software to assist in creating more accurate mine plans and cost estimations (Johnson, 2012). The Deswik Dump Scheduler utilises a detailed method, for the calculation of truck requirements and cycle times, through the use of …


Modelling open pit shovel-truck systems T using the ...

calculation of waiting time for both trucks and loaders. ... Modelling open pit shovel-truck systems using the Machine Repair Model allocation or fleet size estimation. The second stage, which is a truck dispatching stage, is a real-time implementation of ... are commonly used in the mining industry for shovel-truck


MINING TRUCK – ® SIMULATORS

Software – Mining Truck Simulator software and SimU Campus Training Records Management software. Languages supported in the software include English, Spanish, French, Chinese and Portuguese. Support – Telephone support in English, 24x7x365 plus any software maintenance updates for 1 year. This is an annual subscription with a yearly renewal ...